# Well done! A group of students from Dhi Qar University, Department of Oil and Gas Engineering, designed and manufactured a “three-phase” crude oil isolation station, which isolates water and gas from oil, as a project for their graduation from the university.

الانتاج: ٥٠ برميل يومياً
طلبة من ذي قار يصمّمون محطة عزل للنفط الخام: بـ ٢٫٧٠٠٫٠٠٠ دينار فقط وعلى حسابهم الخاص.
"ليكون…

Posted by ‎يلا Yalla‎ on Saturday, May 11, 2024